One firm appears in roughly one of every eight and a half agent-attributed Austin entitlement hearings.
Austin Development Watch maintains a structured record of every Planning Commission and Zoning & Platting Commission case in the public record — thousands of hearings since 2016, each tagged to the agent of record. That record answers a question the market has never had a clean answer to: which firms actually carry Austin’s entitlement docket?
| # | Firm | 10-yr hearings | Approved* | Postponed* | Lead attorneys (hearings) |
|---|---|---|---|---|---|
| 1 | Drenner Group | 720 | 45.4% | 54.0% | Amanda Swor (346), Leah Bojo (288), Dave Anderson (51) |
| 2 | Armbrust & Brown | 549 | 39.0% | 59.9% | Richard T. Suttle (249), Michael Whellan (183), Ferris Clements (43) |
| 3 | Thrower Design | 450 | 40.2% | 59.1% | Ron Thrower (315), Victoria Haase (127), Beth Turner (6) |
| 4 | Alice Glasco Consulting | 274 | 41.0% | 59.0% | Alice Glasco (274) |
| 5 | LJA Engineering | 222 | 83.1% | 16.9% | T. Walter Hoysa (47), Russell Kotara (25), Paul J. Viktorin (23) |
| 6 | Husch Blackwell | 160 | 22.5% | 76.8% | Nikelle Meade (117), Stacey L Milazzo (32), Lindsey Walker (9) |
| 7 | Carlson, Brigance & Doering, Inc | 159 | 85.6% | 14.4% | Bill E. Couch (58), Geoff Guerrero (28), Charles Brigance Jr. (25) |
| 8 | DuBois Bryant & Campbell | 133 | 39.7% | 60.3% | David Hartman (131) |
| 9 | Kimley-Horn | 115 | 77.0% | 23.0% | Joel Wixson (16), Robert Smith (14), Kevin J. Burks (12) |
| 10 | Metcalfe Wolff Stuart & Williams | 93 | 60.9% | 39.1% | Michele Rogerson Lynch (83), Katherine Nicely (9) |
*Method: agent-attributed hearing rows at Austin PC + ZAP, 2016–2026, from ADW’s structured case database (~6,869 hearings; ~6,027 carry an attributed agent), with duplicate agent records resolved to one person. “Approved” and “Postponed” are shares of decided outcomes (recommended/approved vs. postponed/indefinitely postponed), excluding still-pending items; with denials they total 100%. A “hearing” is one appearance of a case before a commission; a single project can generate several. Hearings that have been HEARD only — a scheduled item on a future agenda is forward docket, not record. Firm totals are reconciled to the case level and recomputed weekly — every figure traces to a record. Certified through 2026-10-27.
Coverage note. Hearing counts on this page are FLOORS, and percentages are ESTIMATES computed over the hearings we hold. Measured against the City's own meeting record, the certified store carries 6,712 of the 6,728 hearing items its source documents describe since 2016 — 99.8% — with coverage weakest in 2020 (98.7%). A firm's true hearing count is therefore at least the number shown, and a rate is the rate within the held sample rather than the full population. Coverage is measured, not assumed, and this note is derived from that measurement on every rebuild. A second step sits between these rates and the population: of the 6,667 hearing items read from the minutes, 5,513 (82.7%) state a disposition this record can classify and 1,154 do not. Unclassified items carry no outcome and are absent from every rate above, so a rate is computed over the classified part of a sample, not over the sample and not over the population. THIS LIMITS COMPARABILITY BETWEEN FIRMS. The unclassified items are not spread evenly: engineering and surveying practices carry about 75% of the named ones (Southwest Engineers, LJA Engineering, Perales Engineering, Stantec Consulting Services among them), because subdivision dispositions are recorded in grouped consent motions rather than per item. Those firms' rates therefore rest on a smaller classified subset than a zoning practice's, and a high approval share at the top of the table may reflect which of a firm's matters could be classified rather than how its matters went. WE MEASURE OUR OWN ERROR AND IT IS NOT UNIFORM. Re-reading every minutes block against the stored disposition found 8.2% disagreement across 3,073 independently-written rows before correction — 6.03% in 2017-2019, 11.73% across the remote-meeting years 2020-2022, 6.12% in 2024-2025 — and about 1.56x as high on Zoning and Platting as on Planning Commission. A re-read of the record against the approved minutes is in progress (November 2026). Outcome classes for 2016 to 2018, and for hearings heard after 25 August 2026, have not all been confirmed.
Every firm on this table has a full page: the decade, decoded — the complete hearing arc, outcomes, and district concentration, reconciled to the certified record. See an example →
The market is concentrated at the top and long-tailed below. The four busiest firms — Drenner Group, Armbrust & Brown, Thrower Design and Alice Glasco Consulting — together carry roughly one of every three case hearings that name an agent (33.1%: 1,993 of 6,027); everyone below operates as a boutique. Drenner Group sits clearly at #1, and within it just two attorneys — Amanda Swor and Leah Bojo — account for 88.1% of the firm’s case hearings (634 of 720).
The sharper signal is in the outcome columns. Among the volume leaders the dominant result is neither approval nor denial — it is postponement: Drenner Group 54.0%, Armbrust & Brown 59.9%, Thrower Design 59.1%, with Husch Blackwell (76.8%) higher still. The exceptions on the table — LJA Engineering (83.1% approved, 16.9% postponed), Carlson, Brigance & Doering, Inc (85.6% approved, 14.4% postponed), Kimley-Horn (77.0% approved, 23.0% postponed) — clear with little continuance. A plat disapproved on a subdivision case is counted on its own line and enters no rate, neither as approved nor as denied: LJA Engineering has 90 such case hearings, Carlson, Brigance & Doering 59, Kimley-Horn 39. The dividing line is the work: discretionary zoning moves slowly and gets continued; by-right engineering clears. For anyone selecting counsel, benchmarking a competitor, or underwriting how long a case will take, the firm on the filing is signal — and now it is measurable.
Built from public records (agendas, minutes, and meeting video). Figures trace to the Austin Development Watch structured dataset. Free to read and share with attribution. © 2026 Texas Entitlement / Austin Development Watch · [email protected]