TEXAS ENTITLEMENTAustin Development Watch ›
Firm profile

Texas Engineering Solutions

Land-use entitlement firm · 3 unique cases
5
Hearings
3
Cases
3
Concluded
100.0%
Approved of concluded
2017–2018
Active
0
Since 2024

The record, at case level

Of Texas Engineering Solutions’s 3 unique cases, 3 have concluded — reached a Planning Commission or ZAP decision — and 3 of those ended in approval at their final hearing: 100.0%.

Postponement is a clock, not a verdict: of the 1 concluded cases postponed at least once, 1 still ended in approval (100.0%).

Counted once per case, not once per hearing: a case postponed several times before approval would otherwise read as several losses and one win.

Hearings by year

Texas Engineering Solutions: hearings by year2017: 4, 2018: 1244’171’18

Outcome distribution

Texas Engineering Solutions: outcomesApproved: 3 (60%), Postponed: 1 (20%), Denied: 1 (20%)60%20%20%Approved 3Postponed 1Denied 1

Hearing timeline

Hearing dateOutcomeDistrictAgent
2018-02-13ApprovedD1Stephen Delgado
2017-09-05ApprovedD7James Hagen
2017-08-15PostponedD7James Hagen
Pro · Full record
The complete 5-hearings record is a Pro feature. See what Pro unlocks →

Where they practice

D1 2D7 2D2 1

Hearing-level rates, for comparison

Postponement rate vs the fieldTexas Engineerin: 20%, Field median: 44%Texas Engineerin20%Field median44%
Approval rate 60.0% — above the field (46.1%) by 13.9 pts.

At the hearing level every appearance counts, so a case postponed N times adds N postponements and one decision. Hearing-level approval-of-decided is 60.0% (vs the field’s 46.1%) and postponement is 20.0% — both far from the case-level figure above, for exactly that reason. Two stages, two denominators: these are commission-stage outcomes (approve vs. postpone/deny at the Planning Commission or ZAP hearing), not the City Council vote. Once a Commission-recommended case reaches Council it is approved in the high-90s%, so a low commission-stage approval rate reflects strategic postponement, not defeat.

Recent cases

C8-2017-0027.0AC8-2016-0127C8-2015-0242.0A
Austin Development Watch · every figure traces to a certified record · hearing data through 2026-05-19 · Council outcomes through 2026-04-23 · gate-certified · generated 2026-07-29